Lifespan Structures Bridge Deck

Lifespan Structures working in line with Construction Strategy 2025

Posted by on Sep 11, 2015 in Bridge Design and Engineering Footbridge Special, Composite Footbridges, composites in construction, Construction Strategy 2025, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

Lifespan Structures working in line with Construction Strategy 2025

            Construction Strategy 2025 outlines the challenges that the market place faces over the next few years. The strategy document outlines the need for the industry to; Lower Costs By 33% Both Inital Costs and Whole Life Costs. Faster Delivery 50% Improve speed from inception to completion. Lower Emission 50% Reduce greenhouse gasses such as CO2 Improvement in Export 50% Reduce Trade gap for construction products and materials. The use of an FRP Footbridges instead of traditional forms of construction, already goes a long way to satisfying all of these targets!...

Read More

Bridge Design and Engineering, Article May 2015

Posted by on Jun 4, 2015 in Bridge Design and Engineering Footbridge Special, Composite Footbridges, composites in construction, Footbridge Supplier, FRP Footbridges, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

Bridge Design and Engineering, Article May 2015

The Lifespan Structures Bridge at Sedlecombe featured in an article published in a footbridge special in the Bridge Design and Engineering Magazine last month. For more details on the publication see www.bridgeweb.com Read the full article below;

Read More

Lifespan Structures Bridge Decks

Posted by on Jun 1, 2015 in Composite Footbridges, composites in construction, Footbridge Supplier, FRP Footbridges, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

Lifespan Structures Bridge Decks

Read More

ICE Bridges 2015 – Maintaining Commitment to Infrastructure

Posted by on Jun 1, 2015 in Composite Footbridges, composites in construction, Footbridge Supplier, FRP Footbridges, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

ICE Bridges 2015 – Maintaining Commitment to Infrastructure

We will be supporting CRL Composites at the ICE Bridges 2015 – Maintaining Commitment to Infrastructure conference on Friday 5th June, we look forward to seeing both new and existing customers. For more information – http://www.ice-conferences.com/ice-bridges-2015/

Read More

Institute of Civil Engineers Award for Sedlescombe Footbridge

Posted by on Jun 1, 2015 in Composite Footbridges, composites in construction, Footbridge Supplier, FRP Footbridges, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

Institute of Civil Engineers Award for Sedlescombe Footbridge

The Lifespan Structures designed and supplied footbridge at Sedlescombe was given a Special Award for Environment Engineering and Sustainability at the Institute of Civil Engineers (ICE) awards dinner in Southampton on Friday 29th May 2015!  Well done to all involved!!

Read More

Salvage Turn Bridge – Birmingham

Posted by on Jun 1, 2015 in Composite Footbridges, composites in construction, Footbridge Supplier, FRP Footbridges, Lifespan Structures, Lifespan Structures Bridge Deck | 0 comments

Salvage Turn Bridge – Birmingham

Noticed this long span steel footbridge whilst recently in Birmingham. Apparently it has now become Birmingham’s ‘Love Lock’ Bridge where couples place a padlock on the bridge the throw the key in the canal as an expression of there love. This is copying the Love Lock Bridge in Paris, although I believe all the locks were recently removed from the Paris bridge due to structural safety concerns. I wonder if BD90/05 includes padlocks in dead load calculations!!!!

Read More