Lightweight FRP bridge deck for cycleway delivered. The 15m by 3m structure has been constructed off site and is being unloaded using a lorry mounted crane. Low dead weights allow simplified foundations especially where poor ground conditions exist.
Lightweight Cycleway Bridge Delivered
/ Martin Richardson / BD90/05, BD90/05, Composite, Composites UK, Cycleway, Fibercore, Footbridge, Footbridge, FRP Composites, FRP Composites, Lightweight, Pedestrian
Related
BD90/05 BD90/05 Composite Composites UK Cycleway Fibercore Footbridge Footbridge FRP Composites FRP Composites Lightweight Pedestrian