Off site construction, means bridge production can continue all year round, and minimises installation times. This bridge replaces a corroded steel structure which had reached the end of its service life.
Off Site Construction of FRP Footbridge Reduces Construction Times
/ Martin Richardson / BD90/05, BD90/05, Composite, Composites UK, Fibercore, Footbridge, Footbridge, FRP Composites, FRP Composites, Lightweight, Off Site, Pedestrian, Steel Footbridge
Related
BD90/05 BD90/05 Composite Composites UK Fibercore Footbridge Footbridge FRP Composites FRP Composites Lightweight Off Site Pedestrian Steel Footbridge