600kg FRP bridge deck replaces a 2-3000kg timber bridge, delivered and put in place in just a few hours. The installation of our first generation of lightweight footbridge structures is over 3 years ago now.
FRP Bridge at Sedlescombe - Over 3 years old.
/ Martin Richardson / BD90/05, BD90/05, Carbon Fibre, Composites UK, CUR96, Footbridge, Footbridge, Footpath, FRP Composites, FRP Composites, Lightweight, Pedestrian, Pedestrian, Timber Footbridge, Timber Footbridge, Wooden Footbridge
Related
BD90/05 BD90/05 Carbon Fibre Composites UK CUR96 Footbridge Footbridge Footpath FRP Composites FRP Composites Lightweight Pedestrian Pedestrian Timber Footbridge Timber Footbridge Wooden Footbridge