Skip to content
Lifespan Structures
  • Home
  • Company
  • Projects
    • Location Map
    • Albany Park FRP Bridge Installation
    • Ockwells Park Footbridges
    • Lydney Cycle Bridge, Gloucester
    • Ferrybridge Lock Bridge, Yorkshire
    • Bird Ridding Footbridge
    • East Row Footbridge
    • Purfleet Footbridge
    • Sedlescombe Footbridge
    • Hilly Fields Footbridge
    • Covert Way Footbridge
    • Eastbourne Cycleway FRP Bridge
  • Blog
  • About FRP Composites
  • Contact

Pedestrian

Collaborative Approach to Create New Bridge – Westons Farm Cycle Bridge

July 11, 2022 Martin RichardsonCD368, Composites UK, Footbridge, FRP Composites, Uncategorized
Composites used for FRP bridge

Working together with our sister company Concrete Repairs Limited, and our various other supply chain partners, a new 12.5m by 3.0m wide bridge has been installed. Initially Lifespan Structures were originally commissioned to produce an outline design to allow the […]

Read more

Lifespan Structures – Design Service

March 2, 2022 Martin RichardsonCD368, Composites UK, CUR96, FRP Composites

Information on the design of FRP footbridges has developed quickly over the last few years, with the new version of the DMRB which included the publication of CD368 – Design of fibre reinforced polymer bridges and highway structures, and the […]

Read more

Composite Bridges – A comparison between moulded and pultruded bridges.

March 2, 2022 Martin RichardsonCD368, Composite, FRP Composites, Lightweight
Resin Infusion of composite materials

We have published a technical paper to help clients and specifiers understand the significant differences in terms of installation, performance and long term maintenance of the different types of FRP bridge solutions that are available. There are two generic types […]

Read more

New Botany Footbridge in Tonbridge

October 28, 2020 Martin RichardsonBD90/05, CD368, Composites UK, Footbridge, FRP Composites
Composite footbridge

Off site production allowed us to continue with this project during the lock down.  Once restrictions were eased the existing bridge was removed and the foundations upgraded by CRL working for Kent Highways, before the new bridge was installed in […]

Read more

The use of an FRP Bridge could qualify for an R&D Tax Relief.

October 27, 2020 Martin RichardsonCD368, CUR96, Footbridge, FRP Composites
FRP Bridges

Very few people in the construction industry are aware of the significant commercial opportunity from identifying R&D processes and expenditure within the business. If a contractor has changed or improved a traditional process, and applied it to the project, then […]

Read more

CROW-CUR Recommendation 96:2019 – Now Available in English

October 27, 2020 Martin RichardsonCD368, CUR96, Footbridge, FRP Composites
CUR96

The English Version of CUR96 is now available! CUR96 Recommendation describes the principles for the design of fibre-reinforced polymers (FRP) It is available for download at https://crowplatform.com/product/crow-cur-recommendation-962019/ Please do contact us directly if you would like a to understand more […]

Read more

The revised DMRB replaces BD90/05 with CD368

October 27, 2020 Martin RichardsonBD90/05, CD368, CUR96, Footbridge, FRP Composites
Design for FRP Bridges

The DMRB was updated by Highways England just before the lockdown started. We were probably all distracted from noticing this at the time. The technical changes were substantial, especially regarding FRP bridges but the structure of the suite of documents […]

Read more

FRP Composites provide a sustainable solution

February 12, 2019 Martin RichardsonBD90/05, Composite, Footbridge, FRP Composites, Pedestrian

The construction industry is committed to reducing the environmental impact of its activities. The Construction 2025 joint strategy from the UK Government and industry, working in partnership, sets a vision, which includes 50% lower emissions, 33% lower costs and 50% […]

Read more

PROW Benefits from new 2 span FRP Footbridge

February 12, 2019 Martin RichardsonBridleway, Footbridge, FRP Composites, Lightweight, Pedestrian, PROW
2 Span FRP Footbridge Installed on PROW

This Public Rights of Way (PROW), 2 span bridge was installed in December 2018. The lightweight nature allowed easy installation in this remote location during the winter months and moulded deck technology means long term maintenance will be reduced to […]

Read more

Hounsden Gutter Project Completed

October 3, 2018October 3, 2018 Martin RichardsonBD90/05, Composite, CUR96, Footbridge, FRP Composites, Uncategorized
Easy Installation of FRP Footbridge

The existing skewed reinforced concrete footbridge had come to the end of it life, so an FRP Replacement was selected to provide reduced maintenance in the tree enclosed environment over the Gutter.  Following completion of new abutments and associated retaining […]

Read more

Posts navigation

Older posts

Recent Posts

  • Strengthening the team
  • Composites used for FRP bridge
    Collaborative Approach to Create New Bridge – Westons Farm Cycle Bridge
  • Introduction to FRP Bridges
    CPD Technical Seminars
  • Traffic Bridges
    Replacement FRP Composite Bridge decks
  • Bridge Design

Projects

  • Hilly Fields Footbridge
  • Bird Ridding Footbridge
  • East Row Footbridge
  • Purfleet Footbridge
  • Sedlescombe Footbridge
  • Covert Way Footbridge
  • Ferrybridge Lock Bridge, Yorkshire
  • Lydney Cycle Bridge, Gloucester
Lifespan Structures
martin@lifespanstructures.com
0203 146 7332
  • Home
  • Company
  • Projects
  • Blog
  • About FRP Composites
  • Contact