Articles tagged “CD368”

Composite footbridge

Off site production allowed us to continue with this project during the lock down.  Once restrictions were eased the existing bridge was removed and the foundations upgraded by CRL working for Kent Highways, before the new bridge was installed in June. KCC Cabinet Member for Highways and Transport, and Member for Tonbridge, Michael Payne said:
“This work was carried out to provide a strengthened and refurbished bridge to ensure it continues to be safe river crossing for the public to use. “The original deck was made from railway rails with a type of expanded metal mesh reinforcement, but unfortunately it wasn’t able to handle the number of people using it.

Read more

FRP Bridges

Very few people in the construction industry are aware of the significant commercial opportunity from identifying R&D processes and expenditure within the business. If a contractor has changed or improved a traditional process, and applied it to the project, then the resources involved may qualify as R&D expenditure and contribute to a claim. By offering an alternative construction technique using a Lifespan Structures composite deck, clients can often qualify for an R&D claim which will reduce the tendered costly of the scheme or enhance the profit margin.

Read more

CUR96

The English Version of CUR96 is now available! CUR96 Recommendation describes the principles for the design of fibre-reinforced polymers (FRP)
It is available for download at https://crowplatform.com/product/crow-cur-recommendation-962019/
Please do contact us directly if you would like a to understand more about the content of this document.

Read more

Design for FRP Bridges

The DMRB was updated by Highways England just before the lockdown started. We were probably all distracted from noticing this at the time. The technical changes were substantial, especially regarding FRP bridges but the structure of the suite of documents changed. A summary of these changes can be seen at (https://standardsforhighways.co.uk/dmrb/help#new-structure)
One key change for us is the replacement of BD90/05 with CD368. CD368 updates the approach to FRP bridges. The new approach is now quite closely aligned with current European guidance documents.

Read more